Installation
forpatientstosteadythemselves.Anemergencystopswitchmustbevisibleand
readilyaccessible.AttachthehandlesetandemergencystopswitchBEFOREapplying
powertotheunit.
Pre-AssemblyInspection
1.Ifconnected,disconnectthepowercordfromtherearconnectorpanel.
2.Removethescrewsontheshroudbackandremovethebackpanelandvisually
inspectthefollowing:
a.DriveBelt–Thedrivebeltiscorrectlyadjustedatthefactory,butmay
havechangedduringshipping.BeforeoperatingtheT2100Treadmill,
verifythetensionofthedrivebelt.See“DriveBeltAdjustments”onpage
117forpropertensiontolerances.
b.DriveMotorMount–Verifythatthemountingboltsaresecurelytightened.
c.Harnesses–Verifythatallwiringharnessesaresecurelyattached.
d.ElevationRack–Verifythatnoobstructionsarepresentintheelevation
racks.
InstallHandleSet
Item
Description
1
T-Brackets
2
ShroudBack
3
Grommet
4
Notch
Anotchdesignatestherightsidehandrailfromtheleftsidehandrail.
40
T2100Treadmill
2021403-120F