Chapter 2. Initial Setup
6 Transport® Model PT878 Portable Liquid Flowmeter User’s Manual
2.1 Making Electrical Connections
Before making measurements with the PT878, you must make all the
necessary connections to the unit. This section describes how to connect the
following:
Power
Transducers
Input/Output
Infrared Interface
Make all connections to the top of the PT878 unit as shown in Figure 2
below. Please note that you need to make the proper power and transducer
connections only. The other connections are required for particular
functions, but are not necessary for basic operation.
Note: For a listing of Input/Output connections, see Table 1 on page 8.
Figure 2: Connection Locations
Power
Infrared Transceiver
Downstream
Upstream
Transducer
Input/Output

Table of Contents