EasyManua.ls Logo

GE Versana Essential - Page 274

GE Versana Essential
305 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Probes and Biopsy
5-18 Versana EssentialUser Guide
5759238-100 English
Rev. 2
Planned Maintenance
The following maintenance schedule is suggested for the
system and probes to ensure optimum operation and safety.
Returning/Shipping Probes and Repair Parts
US Department of Transportation and GE policy requires that
equipment returned for service MUST be clean and free of blood
and other infectious substances.
When you return a probe or part for service (Field Engineer or
customer), you need to clean and disinfect the probe or part
prior to packing and shipping the equipment.
Ensure that you follow probe cleaning and disinfection
instructions provided in the Basic User Manual.
This ensures that employees in the transportation industry as
well as the people who receive the package are protected from
any risk.
Table 5-5: Planned Maintenance Program
Do the Following Daily After Each Use As Necessary
Inspect the Probes X X X
Clean the Probes X X
Disinfect Probes X X

Table of Contents

Related product manuals