GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
Chapter 10 - Care & maintenance 10 - 27
10-6-7-2 Generic procedure on probe leakage current (cont’d)
Follow the test conditions and test limits described in:
• Table 10-8 on page 10-16,
or:
• Table 10-9 on page 10-17,
as applicable for every probe.
TO AVOID PROBE DAMAGE AND POSSIBLE ELECTRIC SHOCK, DO NOT
IMMERSE PROBES INTO ANY LIQUID BEYOND THE LEVEL INDICATED IN THE
PROBE USERS MANUAL.
DO NOT TOUCH THE PROBE, CONDUCTIVE LIQUID OR ANY PART OF THE
UNIT UNDER TEST WHILE DOING THE TEST.
Equipment damage possibility. Never switch the Polarity or the status of the Neutral when the
Ultrasound system is powered on. Power off the Ultrasound system, allow the stored energy to
bleed down, and turn the circuit breaker off BEFORE switching the POLARITY switch and/or the
NEUTRAL switch on the leakage meter to avoid possible power supply damage.