We recommend a flow velocity of at least 2 m/s.
9.2 Passivation
Before commissioning a plant, passivation is commonly carried out for long pipes
and tanks. Valve blocks are usually excepted from this.
Passivation is typically performed using nitric acid (HNO
3
) at approx. 80 °C (176
°F) at a concentration of 3 % and a contact time of 6 to 8 hours.
The ultimate temperatures, chemicals, concentrations and contact time to be
used must be determined by the plant operator along with its chemical supplier.
Cleaning and Passivation
Passivation
430BAL008583EN_1
26 12.08.2019

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GEA VARIVENT Series and is the answer not in the manual?

GEA VARIVENT Series Specifications

General IconGeneral
SeriesVARIVENT
ActuationPneumatic
Connection TypesClamp, weld end, threaded, flange
ApplicationFood, beverage, dairy, pharmaceutical, and chemical industries
StandardsEHEDG, FDA, 3-A
MaterialsStainless steel

Related product manuals