V 03/13
OptiSpray DPP01 Start-up and operation • 19
OptiSpray DPP01 - functional check and operation
Note:
By the assembly or the first start-up, it is recommended to carry out
the functional check without powder!
Operation
The OptiSpray DPP01 Dense phase pump is switched on by pressing the
Mains Switch key on the rear side, the status LED Power on the front
side illuminates. The OptiSpray DPP01 Dense phase pump is ready for
operation.
Switching on and off the conveying procedure
The conveying procedure is switched on and off by the CG09-P Control
unit (see the corresponding operating manual).
Switching on and off the rinsing procedure
The rinsing procedure is switched on and off by the CG09-P Control unit
(see the corresponding operating manual).
Manual switching on and off the rinsing proce-
dure on the pump
By pressing the corresponding key (depending on the desired rinsing di-
rection), the rinsing procedure will be started. The powder chambers are
cleaned thoroughly by the internal cleaning program. Afterwards the
pump switches off.
The rinsing procedure can be terminated by pressing a key again.
Note:
If the "Rinsing" function was activated locally on the equipment, the
rinsing procedure will be terminated by a control unit command!
Note:
The suction hose and the conveying hose must be emptied before
the rinsing procedure starts!