EasyManua.ls Logo

Getinge HS 6613 AR-2 - Goods Handling; Things to Do When the Work is Finished

Getinge HS 6613 AR-2
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Procedure from operator panel
Process check
Check that the completed process has been carried out correctly by
comparing the process printout with a corresponding type load printout
from the sterilizer validation.
Goods handling
Remember that the goods may contain a considerable amount of heat
when unloaded. Position them with regard to a good working
environment.
Things to do when the work is finished
Unless otherwise prescribed by local rules:
Turn off the control power supply by the switch on the front.
Inspect the strainer in the bottom of the chamber and clean it if
necessary.
Close valves for air, water and, if used, steam and gas.
If necessary:
Shut down the sterilizer for long enough to let it cool down, eg
overnight.
The green process complete lamp lights on completion
of a fault-free process.
If the door on the discharge side does not
open automatically, press the button.
/ [OPEN]
Select a new program immediately unless the same program is to be
used for the next sterilization.
Note that the goods may be very hot immediately after
unloading.
Let the goods cool down or wear safety gloves to handle
them.

Related product manuals