EasyManua.ls Logo

Getinge HS 6613 AR-2 - How to Interpret the “Process Complete Indicator; Stopping the Program or a Blowing Safety Valve

Getinge HS 6613 AR-2
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
Clean the inside of the chamber. Use a chlorine-free cleaner if
necessary.
The cleaning instruction is given in the section “General advice on
using the sterilizer” in the Operation chapter.
How to interpret the “Process complete” indicator
Normal routine program
After completion of fault-free normal routine process, the indicator
shows a steady green light.
Maintenance programs
After a completed, fault-free automatic leakage test or filter
sterilization, for example, the indicator shows a flashing green light.
Normal routine program with fault
After completion of stepped or alarmed normal routine process, the
indicator shows a steady red light.
Maintenance programs with fault
After completion of a stepped or alarmed maintenance program the
indicator shows a flashing red light.
Stopping the program or a blowing safety valve
In an emergency, the program can be stopped or a safety valve that is
blowing off can be made to close, by means of the EMERGENCY
STOP button on the front panel, without disabling the safety systems of
the unit. An alarm is triggered when the program is stopped.
Press the EMERGENCY STOP button.
Follow the instructions under “What to do if there is an alarm”
below.
The sterilizer must always be cold when cleaned. To
prevent injury, switch off the power to the control system.
Only switch off the control unit power switch as a last
resort, since this affects the safety systems of the
installation.
The main power supply switch or disconnector to the
sterilizer may be turned off only in an emergency.

Related product manuals