2
Units:
2 Safety
The SS series inverter of Jiangsu GoodWe Power Supply
Technology Co. Ltd. ( hereinafter referred to as GoodWe )
strictly conforms to related safety rules in design and test.
Safety regulations relevant to the location shall be followed
during installation, commissioning, operation and maintenance.
Improper operation may cause serious injury, electric shock
and/or damage to equipment and property.
` Installation, maintenance and connection of inverters must
be performed by qualified personnel, in compliance with
local electrical standards, regulations and the requirements
of local power authorities and/or companies.
` To avoid electric shock, DC input and AC output of the
inverter must be terminated at least 5 minutes before
performing any installation or maintenance.