EasyManua.ls Logo

Graco PR70 - Heat Options, Screen #2

Graco PR70
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
On-Board Stainless Steel Feed Systems
3. If the feed system doesn’t come with a desiccant dryer or a nitrogen pump already installed, install them into
the top ball valve (1/4” NPT for onboard lids and 3/4” NPT for off-board lids) and close the ball valve
Insert Desicant Dryer Or
Nitrogen in top ball valve
Figure 33: Installing air treatment (if any) and Turning off Inco (Off-board lid shown, follow
same steps for on-board lids)
ming Air Valve
4. Attach the vacuum pump to the lower ball valve (1/4” NPT for onboard lids and 3/4” NPT for off-board lids) and
turn on your vacuum pump
Insert Vacuum Pump into
lower ball valve
Figure 34: Where to hook up the vacuum pump (Off-board lid shown, follow same steps for on-board lids)
312394B 29 of 71

Other manuals for Graco PR70

Related product manuals