Startup
3A9095C 19
Startup
1. Perform Pressure Relief Procedure,
page 14.
2. Remove spray tip and tip guard.
3. Turn pressure control OFF.
4. Turn the prime valve down.
5. Turn ON/OFF switch to ON position.
6. Place suction tube in paint pail. Place
drain tube in waste pail.
7. Turn pressure control to 10 o’clock
position. Allow paint to circulate through
drain tube for 15 seconds.
8. Turn prime valve horizontal. Disengage
trigger lock.