EasyManua.ls Logo

Grant Spira Series - Wiring Diagrams

Grant Spira Series
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical
34
8 Electrical
5. Connect the other end of the 4-
core flex to the either the heating
system controls wiring centre or
junction box. Refer to either Figures
8-9 or 8-10, as appropriate, for
details of the connections required.
6. Fit the two parts of the 4-way
connector back together. Ensure
the plug and socket are fully
pushed together until the small
catch clicks into place.
In the event of an electrical fault after
installation of the boiler, the following
electrical system checks must be
carried out.
Short circuit
Polarity
Earth continuity
Resistance to earth
The Grant wood pellet boiler and
intermediate hopper contains
electrical switching equipment and
must be earthed; also any bulk
hopper system fitted should also be
earthed.
!
WARNING
Figure 8-5: Boiler internal wiring diagram
8.6 Wiring Diagrams

Table of Contents

Other manuals for Grant Spira Series

Related product manuals