Section 10: Commissioning
10 COMMISSIONING
To ensure safe and e󰀩cient operation, it is essential that a Grant
Vortex Pro boiler is commissioned as detailed in the following
procedure.
To access the controls, remove the front door from the boiler
casing (pull forward at the bottom and then lift o󰀨).
The the position and details of control panel for the Vortex Pro
External boiler are shown in Figure 10-1.
Figure 10-1: Vortex Pro External boiler components