GREE                                                                        GMV5E DC INVERTER VRF UNITS SERVICE MANUAL 
    118   
At  last,  engineering  commissioning  is  completed  when  " "  is  displayed  on  "Project  Debug 
Completion". 
 
Note:
 During commissioning, users must listen to the operating sound of outdoor and indoor fans 
and compressors to check for exceptions.   
3.3.3.2.3 Commissioning Through the Portable Commissioning Tool 
Step 1: Connect the Portable Commissioning Tool. Please refer to the operation manual of Portable 
Commissioning Tool for the connection method.   
Step 2: Setting DIP of ODU address. You must set this DIP in main control ODU. The setting code 
(SA8) of main control unit shall be set to “00”. Otherwise, it is invalid. 
Step 3: On the home page, press Unit Debug to enter into the page of engineering debugging.