Error judgment condition and method:
During commissioning, check if ODU cut-off valve is opened through detecting system parameter by
pressure sensor. If the parameter is abnormal, it will indicate that confirming the open of cut-off valve and
then press SW5 to enter the next step after confirming.
Possible reason
ODU cut-off valve is not opened;
Troubleshooting:
Confirm again and open ODU cut-off valve.
2.2.4.136 U8 IDU pipeline error
Error display:
ODU mainboard, IDU wired controller and IDU receive light board will
display
Error judgment condition and method:
During commissioning, check if IDU pipeline is blocked through detecting IDU pipeline. If the
parameter is abnormal, it will indicate t
Possible reason
Electronic expansion valve doesnt operate normally;
IDU pipeline is blocked;
Troubleshooting:
2.2.4.137 U9 ODU pipeline error
Error display:
ODU mainboard, IDU wired controller and IDU receive light board will
display
Error judgment condition and method:
During commissioning, check if ODU pipeline is blocked through detecting system pressure. If the
parameter is abnormal, it will indicate this error.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV5E Series and is the answer not in the manual?

Gree GMV5E Series Specifications

General IconGeneral
BrandGree
ModelGMV5E Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals