GREE GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
279
Gas/liquid separator
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
Diagram
Operation Procedure
5. Install a new
gas/liquid separator.
●Put the gas/liquid separator
based on the position of the
suction and discharge pipes and
weld the pipes with the gas/liquid
separator.
●During welding, charge nitrogen
into the pipes. The pressure
should be controlled within
0.5±0.1 kgf/cm2 (relative
pressure).
Note: Avoid nearby parts from
being burnt during welding.
●Screw the gas/liquid separator.
6. Fix and wire the
electric box.
●Put the electric box back to
original position and screw it.
Connect all lines.
7. Check and install the
front panels.
●Check various parts and
connecting lines.
If no problem is found, hook the
front panels and tighten the
screws.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV5E Series and is the answer not in the manual?

Gree GMV5E Series Specifications

General IconGeneral
BrandGree
ModelGMV5E Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals