EasyManua.ls Logo

Hach DR/2010 - Page 22

Hach DR/2010
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
4. Pour 25 to 50 mL of demineralized water into the funnel and allow the
funnel to drain. If necessary, move the stand pipe up or down to
achieve the proper liquid level. When properly adjusted, the funnel
drains smoothly and stops draining at the correct level.
Figure 3 Installing the Pour-Thru Cell
The drain tube attached to the stand pipe must drain freely. It should
always remain below the outlet of the stand pipe, and should not run
horizontally any more than necessary. Preferably, the tube should be as
short as possible with the outlet end inserted into a drain (or suitable
collecting vessel if treatment is necessary before discharge).

Table of Contents

Related product manuals