EasyManua.ls Logo

Hach polymetron 9240 - Reagents Installation

Hach polymetron 9240
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
Installation
4.4.5 Reagents installation
1. Prepare the reagents according to Reagent Preparation on page 137. Install the reagent
canisters in their place and connect them to their respective tubes.
2. Install and connect the conditioning solution (diisopropylamine). The diagrams show an
analyzer for non-cationic applications. Analyzers for cationic applications have a small pump
installed above and to the left of the reagent canisters.
3. Install and connect the reactivation
solution (blue R label).
4. Install and connect the auto calibration
solution (yellow CAL label).

Table of Contents

Other manuals for Hach polymetron 9240

Related product manuals