EasyManua.ls Logo

Hach polymetron 9240 - Section 5 Operating Instructions; 5.1 Data entry

Hach polymetron 9240
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58
Installation
4.5 Analyzer stabilization
At this stage the analyzer has been completely installed, but needs to run for a period of time to
stabilize.
1. On the analyzer, press Start on the main menu to start the measurement process.
2. Leave the system to run for a couple of hours before starting any calibrations.
4.6 Analyzer setup
After the analyzer has stabilized, the system and user parameters must be set, followed by an
initial calibration.
1. SYSTEM SETUP - see System Setup on page 73.
2. USER SETUP- see User Setup on page 79.
3. CALIBRATION - see Calibration on page 93 and launch a two point calibration.
Note: The complete calibration cycle will last around 1 hour. However, the instrument cannot be calibrated
until at least one complete measurement cycle has been successfully performed. An attempt to calibrate the
instrument before this will result in a ā€œNot authorizedā€ message being displayed.

Table of Contents

Other manuals for Hach polymetron 9240

Related product manuals