EasyManua.ls Logo

Hach QC8500 Series 2 - Apply Power to the Pump; Pump Tubing Installation

Hach QC8500 Series 2
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Installation
3.2.2 Apply power to the pump
To apply power to the pump:
1. Turn on the power strip, then turn on the power switch on the back of the pump
(Figure 14). In an RP-150 Model pump, the top panel will show the set speed of 35.
3.2.3 Pump tubing installation
To install the pump tubing:
1. Remove all of the pump cartridges. Press the cartridge holder against the pump, then
lift the cartridges out (Figure 15).
Figure 14 Power switch location
1 Power switch
Figure 15 Pump cartridge removal
1 Cartridge 2 Cartridge holder

Table of Contents

Related product manuals