EasyManua.ls Logo

Hach QC8500 Series 2 - Waste and Sample Line Installation

Hach QC8500 Series 2
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Installation
3.1.5 Waste and sample line installation
3.1.5.1 Sample line
A sample line consists of a union connector, 130 or 190 cm of Teflon
®
tubing 0.8 mm
(0.032 in.) ID, two pump tube adapters, a green-green pump tube with its ends trimmed
to 2 cm past both green tabs and 30 cm of Teflon tubing 0.8 mm (0.032 in.) ID.
To install the sample line:
1. Trim the ends of a green-green pump tube to 2 cm past both green tabs (Figure 7).
This procedure only applies to the green-green pump tube used in a sample line. All
other pump tubes do not need to be trimmed.
Note: Refer to the QuikChem method to find the pump tube color to be used as a sample line.
Most manifolds will use a green-green pump tube, but there are some exceptions.
2. Attach the sample line pump tube on a pump tube cartridge (Figure 8). Do not clamp
down the cartridge on the pump. Refer to Section 4 on page 29 for further details.
3. Connect the 30 cm Teflon tubing to port 6 of the injection valve.
4. Connect the 130 or 190 cm Teflon tubing to the probe on the sampler.
Figure 6 Flow cell connectors
1 To waste 2 Inlet (from manifold)
Figure 7 Trimming the green-green pump tube
1 Scalpel 2 Green-green pump tube 3 Green tab (2x)
1
2
3
20 mm
20 mm
[0.79 in]
[0.79 in]
Figure 8 Sample line pump tube and cartridge
1 From probe 2 To injection valve

Table of Contents

Related product manuals