EasyManua.ls Logo

Hach QC8500 Series 2 - Page 16

Hach QC8500 Series 2
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Installation
3.1.5.2 Waste line
A waste line consists of a 13 cm of Teflon tubing 0.8 mm ID, a pump tube adapter, 150
cm of Tygon tubing 1.5 mm ID, a glass weight and a plastic nipple. Refer to Figure 9.
To install a waste line:
1. Connect a waste line to port 5 of the injection valve and the top connector of the
flow cell.
2. When running two or more channels simultaneously, interconnect adjacent valves by
installing 15 cm of 0.8 mm Teflon tubing between ports 5 and 6 (Figure 10 on
page 15). The waste channel farthest from the System Unit will drain directly into the
waste container. Refer to Section 4 on page 29 for details.
Figure 9 Waste line
1 13 cm Teflon 0.8 mm ID 5 To waste container
2 Adapter 6 Nipple
3 150 cm Tygon 1.5 mm ID 7 From flow cell or valve (port 5)
4 Glass weight

Table of Contents

Related product manuals