EasyManua.ls Logo

Hach Sigma 900 MAX - Installing the Full-Bottle Shut-Off Device

Hach Sigma 900 MAX
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
Installation
4.8 Installing the full-bottle shut-off device
1. Install the rubber grommet into the center hole provided in the cap of the composite
bottle.
2. Slide the Full Bottle Shut-Off, float first, into the bottle through the center of the
grommet.
3. Connect the cable on the full bottle shut-off to the bottom of the controller (Figure 20).
Turn to tighten.
4. Attach the cable assembly to the twist clip.
5. Slide the slot in the tubing support around the retainer pin on the top inside surface of
the refrigerator (Figure 20). Make sure that the tube exits through the ends of the
tubing support.
6. Position the thumbscrew over the threaded hole and hand-tighten to hold the tubing
support in place.
7. Connect one end of the tubing to the inside tube fitting (Figure 20).
8. Insert the other end of the tubing into the off-center hole provided in the cap of the
composite bottle.
Figure 19 Distributor installation
1 Sampler fitting 4 Thumbscrew
2 Retainer pin 5 Arm stop
3 Slots 6 Twist clip
Goodnal STP ST041 Pre Treatment (Sigma 900 MAX All Weather Refrigerated Sampler) Vendor Manual
Q-Pulse Id VM373
Active 29/10/2013
Page 40 of 122

Table of Contents

Related product manuals