I
@5+~=e:*-~i
Page
57
Install the other parasitic choke from solder lug DL
6-1) to solder lug DK (NS).
Tighten the screws in the tops of the two plate
connectors.
Refer to Detail 4-15C and open up the ends of
a
3"
length of metal braid with
a
pencil. (Note that the
metal braid
is
actually flattened tubular braid.) Push
one end onto the 318" projecting end of the parasitic
choke at DK (S-3). Push the other end over the solder
lug on the capacitor
at
DN (S-I
).
Detail 4-15B
NOTE: When you install parasitic chokes in the following
steps, center the chokes between the solder lugs.
Y
/
PENCl SMALL
L
OR
k-/J
Cut each lead of the two parasitic chokes (#45-53) to
SCREWDRIVER
a length of 718".
/
(
tJ)
Refer to Detail
415B
and install a parasitic choke
from solder lug DJ (S-1) to solder lug DK (NS). Note
that the lead of the parasitic choke extends through
solder lug DK for approximately 318". Leave this lead
straight as shown in the Detail.
Detail 4-15C