Page 20
PICTORIAL 3-1
FRONT PANEL
NOTE: To avoid scratching the front panel and meter faces
during the following steps, place
a
soft cloth on your work
table.
Refer to Pictorial 3-1 for the following steps.
(
4
Refer to Detail 3-1A and install the Heathkit
nameplate in the two holes marked ED. Use the two
speednuts.
SPEEDNUT
3
0
Detail 3-1A
INSET
. .
-:.:.
,.
.:'
:
.
,..:
;,;,:
:..:
.:.
.:..
?.
. .
. .
.
,
.
.. .
PUSH-ON
CONTROL
NUT
CONTROL
,FLAT WASHER
Detail 3-1B
J
(d
Refer to Detail 3-16 and install the 3-position rotary
switch
(#63-47) at EU. Use
a
control lockwasher, a
control flat washer, and a control nut. Position the
switch lugs as shown in the Pictorial.
(
4
Refer to Detail 3-1C and install the 100 k!2 sensitivity
control
(#lo-12) at ET. Use
a
control solder lug,
a
control flat washer, and
a
control nut. Form the
control solder lug as shown. Then align the control
solder lug with lug 1 of the control.
Detail 3-1C