EasyManua.ls Logo

Helmholz NETLink PRO Series - INAT-OPC-Server (INAT GmbH); Configuring the INAT OPC server

Helmholz NETLink PRO Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NETLink
®
PRO family Application Examples
14
4 INAT-OPC-Server (INAT GmbH)
The following steps must be performed in the described se-
quence (status May 2008):
4.1
Configuring the INAT OPC server
The following dialog box opens when you select “Configura-
tion->AccessPathDefinition” from the menu:
A new connection is generated via menu “Configuration->New”
in dialog box “Access Path Definition”.
The following dialog box opens.
When you have confirmed the new connection with the OK
button, you can set the parameters in the subsequent dialog
box:

Related product manuals