4 INAT-OPC-Server (INAT GmbH)
The following steps must be performed in the described se-
quence (status May 2008):
4.1
Configuring the INAT OPC server
The following dialog box opens when you select “Configura-
tion->AccessPathDefinition” from the menu:
A new connection is generated via menu “Configuration->New”
in dialog box “Access Path Definition”.
The following dialog box opens.
When you have confirmed the new connection with the OK
button, you can set the parameters in the subsequent dialog
box:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Helmholz NETLink PRO Series and is the answer not in the manual?

Helmholz NETLink PRO Series Specifications

General IconGeneral
BrandHelmholz
ModelNETLink PRO Series
CategoryGateway
LanguageEnglish

Related product manuals