EasyManuals Logo

Hirschmann MACH104-20TX-FR Series User Manual

Hirschmann MACH104-20TX-FR Series
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
28
Installation MACH104
Release
08
01/2019
Proceed as follows:
Take the SFP transceiver out of the transport packaging (1).
Remove the protection cap from the SFP transceiver (2).
Push the SFP transceiver with the lock closed into the slot until it latches
in (3).
2.3 Wiring and installing the signal contact
Figure 11: 2-pin terminal block
Every time you connect the electrical conductors, make sure that the
following requirements are met:
The electrical wires are voltage-free.
The connected voltage is limited by a current limitation device or a fuse.
Observe the electrical threshold values for the signal contact.
See “General technical data” on page 37.
Remove the terminal connector from the device.
Connect the signal contact lines with the terminal block connections.
Mount the terminal block for the signal contact on the front of the device
using the screw lock. Check whether the terminal block is correctly
plugged and screwed on.
You find the prescribed tightening torque in chapter:
“General technical data” on page 37
WARNING
ELECTRIC SHOCK
Never insert sharp objects (small screwdrivers, wires, or similar items) into
the connection terminals for the signal lines, and do not touch the terminals.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
FAULT

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hirschmann MACH104-20TX-FR Series and is the answer not in the manual?

Hirschmann MACH104-20TX-FR Series Specifications

General IconGeneral
BrandHirschmann
ModelMACH104-20TX-FR Series
CategoryNetwork Router
LanguageEnglish

Related product manuals