EasyManua.ls Logo

Hitachi J300 Series

Hitachi J300 Series
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-4
Daily Inspection and Periodic Inspection (2/3)
Inspection cycle
Inspection
location
Inspection item Inspection content Inspection method Criteria
Standard
replacement
period
Instruments
Main
circuit
Terminal board No damage. Visual inspection No abnormalities.
Smoothing
capacitor
(1) Check for leaking
(2) Check for swelling
Visual inspection of
(1) and (2).
No abnormalities in (1) and
(2).
5 years
(Note 1)
Relays (1) Check for stuttering noise
when operating
(1) Aural inspec-
tion.
(1) No abnormalities.
5 years
Regularly
Periodic
Resistors (1) Check for large cracks
or changes in color
(1) Visual inspection. (1) No abnormalities.
Cooling fan (1) Check for abnormal
vibrations and noise
(2) Check for dust
(1) Rotate manually
with power off
and increase
tightening
(2) Visual inspection
(1) Smooth rotation
(2) No abnormality
2 - 3 years
___
___
___ ___
___
___
___
CTi Automation - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.ctiautomation.net - Email: info@ctiautomation.net

Table of Contents

Other manuals for Hitachi J300 Series

Related product manuals