2 Unit Installation
22
SMGB0064 rev.0 - 08/2011
2.6 Place provision
2.6.1 Place provision for RAS-(3-12)H(V)RNM(2)(E) and RAS-(4-10)H(V)RNS(2)E
Concrete foundation
• Foundation could be on at and it is recommended to be 100-300 mm higher than ground level.
• Install a drainage around foundation for smooth drain.
• When installing the outdoor unit x it by M10 anchor bolts.
• When installing the unit on a roof or a veranda drain water sometimes turns into ice on a cold morning. Therefore avoid
draining in an area that people often use because it may become slippery.
Metal plate for RAS-(3-6)H(V)RNM2E and RAS-(4-10)H(V)RNS(2)E
1 Outdoor unit.
2 Cut this portion of bolt If not it’s difcult to remove Service co-
ver.
3 Mortar hole (Ø100 x Depth 150).
4 Anchor bolt M10 (Ø12.5 Hole).
5 Drainage (Wide 100 x Depth 150).
6 Drainage.
7 Vibration-proof rubber.
N O T E
• (*): Space for downward piping space.
1
2
3
4
56
7
4
Anchor bolt location in case of RAS-(8–12)HRNM
(1)
.
(1)
The whole base of the outdoor unit should be installed on a foundation. When using vibration-proof material it should also
be positioned in the same place. When installing the outdoor unit on a eldsupplied frame use metal plates to adjust the
frame width for stable installation as shown in the gure below.
1. Outdoor unit is unstable
2. Frame.
3. Outdoor unit is stable.
4. Metal plate.
A. For RAS-(3-6)H(V)RNM2E 57 mm. Base width for outdoor unit.
For RAS-(4-10)H(V)RNS(2)E 70 mm. Base width for outdoor unit.
For RAS-(8-12)HRNM: 100 mm. Base width for outdoor unit.
B. 60 mm. Frame width (Field supplied).
C. For RAS-(3-12)H(V)RNM(2)(E) 100 mm or more Metal plate.
For RAS-(4-10)H(V)RNS(2)E: 70 mm or more Metal plate.
A
B
2
1
A
C
2
3
4
INCORRECT CORRECT