EasyManua.ls Logo

Hitachi RAS-3-HVNC - Page 44

Hitachi RAS-3-HVNC
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Unit Installation
30
SMGB0079 rev.0 - 01/2013
Locations of xing holes
The holes Location shall be made by using self-screws (M4x13)
and later shall be used SUS screw (M5x12) for xing air ow gui-
de.
1 Outdoor Unit
2 Hole (4 locations)
1
2
One ow guide installation
1 Air discharge grille
2 Air ow
3 Outdoor unit
4 M5 xing screw x4 (Accessories)
5 Air ow guide
1
2
3
4
4
5
Service space (In case of upward air discharge)
In case of right and left sides air discharge enough space for
air discharge is required.
The downward air discharge is also available. In such case
install the base under the unit to secure enough space for air
discharge.
In case of serial units installation air discharge should be
upward.
1 Min.150 mm
2 Outdoor unit
3 Air ow guide
4 Passage side

Table of Contents

Related product manuals