3. Piping work and refrigerant charge
76
SMGB0079 rev.0 - 01/2013
Step 3: Calculation of total additional refrigerant charge (W (kg))
•  For all UTOPIA units except RAS-(8-12)HN(P/C)(E)
Put weight W
1
 and W
2
 calculated in step 1 and step 2 into the following formula:
W = W
1
 + W
2
System example (W) = + = kg
•  For UTOPIA units RAS-(8-12)HN(P/C)(E)
In case of RAS-(8-12)HN(P/C)(E), it must be used the following formula:
W = W
1
 + W
2
 - C
System example (W) = + – = kg
C: Compensation value (kg) (Refer to the following table)
Model Compensation value (C (kg))
RAS-8HN(P/C)E 1.6
RAS-10HN(P/C)E 2.0
RAS-12HN(P/C) 2.0
  C A U T I O N
Donotexceedtheallowedmaximumadditionalcharge
Step 4: Charging work
Charge refrigerant (R410A) into the system according to the instructions in the Service Manual.
Step 5: Total refrigerant charge of the system (W
TOT
 (kg))
The total refrigerant charge of this system is calculated by the following formula:
W
TOT
 = W + W
0
System example (W
TOT
) = + = kg
W
0
 is the outdoor unit refrigerant charge before shipment explained before, and it’s shown in its specic table.
Finally, record the refrigerant charge quantity in order to facilitate maintenance and servicing activities.  
Total additional charge W
kg
kg
Total ref. charge of this system
Date of ref. charge work
Year
Month
Day