19
Charger Operations Continued
→
→
INC ►
Internal resistance of the individual cells when when the battery is
connected with balance lead.
From the process screen pressing the DEC will display a variety of charger
settings.
Final voltage setting when the program ends.
Internal and External temperature.
(Temperature probe required to show external temperature.)
Cut o temperature.
7.9 7.7 mΩ
6.7 0.0 mΩ
LP3s 1.5A 12.14V
BAL 000:50 00022
→
→
→
→
→
→
DEC
DEC
DEC
►
►
►
End Voltage
12.6V(3S)
Ext. Temp
Int. Temp 37
Temp Cut-Off
50=C