EasyManua.ls Logo

Honeywell HON 673 - Completing the Maintenance

Honeywell HON 673
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
HON 380 gas pressure regulator with HON 673/674 controller 63
Figure Step Description
2 Tighten the screws (1) with the lock-
ing washers (2) in a criss-cross se-
quence. Tightening torque: 20 Nm
3 Reinstall all the pipes you removed
previously on the monitoring device.
Measuring line (1)
Vent line (2)
Depending on what you want to do next, proceed as indicated in the relevant sec-
tion:
Completing the maintenance (see page 63)
8.10 Completing the maintenance
When conducting work involving the pipework, please always observe the follow-
ing:
Figure Description
Do not twist the pipe connections in the assem-
blies.
Use a second spanner wrench for securing
when loosening and tightening pipe joints.
Proceed as follows:
Checking the system for leaks (see page 31)
Next task
Protecting the pipe
connections from be-
ing twisted
Next task

Related product manuals