7
 
Project planning information
 
7
 .
1
 
C
ab
l
e
 
s
e
l
e
c
t
io
n
 
Use mains cable suitable for the type of operation and 
complying with local regulations.
 
Signal and control line: max. 2.5 mm
2
. 
Cable for burner ground/PE wire: 4 mm
2
.
 
Do not route IFD cables in the same cable duct as 
frequency converter cables or other cables emitting 
strong fields.
 
Ionization cable and ignition cable
 
Use unscreened high-voltage cable for both lines, see 
page
 
34 (Accessories).
 
Recommended cable length: 
Ionization cable – max. 75 m, 
Ignition cable:
 
IFD 258: max. 5 m, recommended < 1 m (with TZI/TGI), 
IFD 258..I: max. 1 m, recommended < 0.7 m.
 
The longer the ignition cable, the lower the ignition ca- 
pacity.
 
Avoid external electrical interference.
 
Lay cables individually and not in a metal conduit, if 
possible.
 
Lay the ignition cable and UV cable/ionization cable as 
far apart as possible.
 
Screw the ignition cable securely into the ignition trans- 
former TGI/TZI and feed it out of the unit on the short- 
est possible route (no loops).
 
Only use radio interference suppressed electrode 
adapters (with 1 k
 
resistor) for ignition electrodes, see 
page 34 (Accessories).
 
UV cable
 
The UV cable should be no longer than 100 m and 
should be laid as far as possible from the ignition cable.
 
7
 .
2
 
S
t
a
r
 
e
l
e
c
t
r
od
e
s
 
We recommend using 7.5 kV ignition transformers on 
burners with star electrodes.