EasyManuals Logo

Honeywell ML200R User Manual

Honeywell ML200R
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
Chapter 3 - Plan and Install MLPLC
ATTENTION
l If bases are installed without adequate spacing, the air temperature (Tb + Tr) may rise up to
15°C for the fiber optic module and the module installed right above the power module.
l Ensure that air temperature around the module does not exceed 55°C.
3.1.3 Grounding requirements
Grounding for cabinet mounting
1. Take sufficient measures against noise in PLC, making it possible to be used without
grounding.
2. Use dedicated grounding for the wires as far as possible.
3. If the grounding is functional, use class 3 grounding, (grounding resistance must be 100 or
less).
4. If it is not possible to use dedicated grounding, use common grounding, as depicted in the
following figure.
- 27 -

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell ML200R and is the answer not in the manual?

Honeywell ML200R Specifications

General IconGeneral
BrandHoneywell
ModelML200R
CategoryController
LanguageEnglish

Related product manuals