EasyManua.ls Logo

Honeywell TotalPlant LCN - Page 26

Honeywell TotalPlant LCN
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LCN System Installation 3-10 9/96
3.5.2
6. Insert a Flexible Spacer, Bottom Inline, 51308038-100, between the two lower
monitors as shown in Figure 3-7. The spacer fits in the groove behind the bezel,
on both stations, with the top even with the middle of the CRT Mount (wedge.)
7. Upper Monitors:
If there is an upper monitor in both stations, and they are tilted forward, insert a
Flexible Spacer, Bottom Inline, 51308038-100, between the two upper
monitors.
8. Bolt the second station to both complexing tie plates.

Table of Contents

Related product manuals