LCN System Installation 14-1 9/96
14
DESKSIDE GLOBAL USER STATION
Section 14
Provides for the installation of the Deskside Global User Station.
ESD Wrist Strap
Use ESD
Wrist Strap
Use an ESD Wrist Strap grounded to the Minitower chassis when
connecting or disconnecting cables.
14.1 PREINSTALLATION
Before starting to install the Global User Station hardware, the LCN cables, Cable A, and
Cable B must be installed to the location of the Global User Station unit. The T-connectors
must be located directly below the location of the Global User Station Minitower.
14.2 AUDIT EQUIPMENT
Audit the components received with the shipment before starting the installation. The list
below represents the items identifiable from the outside of the unit. Optional items that are
normally located inside the minitower are not listed. These items would not hinder the
installation of the unit. All options ordered are already installed.
Item
Part Number/
Model Number
Quantity Description
51196900-100 1 PPC Minitower
51196793-100 1 17” Monitor, Power cord and Interface Cable
51196708-180 1 PC Keyboard and Mouse
51305313-100 1 MAU to LCNP cable
51305334-100 1 LCN MAU Cover
51191782-100 1 Ethernet MAU (AUI Interface Module)
Optional Items
MX-MTMA21-100 1 21 “ Monitor, Power Cord
51192126-400 1 Cable, CRT Signal with Ferrite
HI-DTSC00-100 1 21” Touchscreen for First 21” Monitor
HI-DCRT20-100 1
2
nd
21” Monitor, Dual Monitor Driver Board, Cable
HI-MEM000-100 1 Additional 32 MB Parity Ram
HI-DZIP00-100 1 Zip Cartridge Drive
HI-DTAP00-100 1 1 GB Tape Drive for Back-up