LCN System Installation 9/96
About This Publication
This publication provides instructions for use by the system hardware installation and checkout
personnel.
It is designed to help you determine if the system hardware is properly installed and ready for
system checkout. Use this publication any time the system is shut down for equipment
replacement, expansion, or relocation.
The checkout personnel should be familiar with the contents of the
TPS System Site Planning
manual and the
LCN Planning
manual in the
System Site Planning - 1
binder, and the
LCN System
Checkout
manual in the
LCN Installation
binder.
This publication supports TotalPlant Solution (TPS) System network Release 510 and CE
Compliant hardware. TPS is the evolution of TDC 3000
X
.
Any equipment designated as "CE Compliant" complies with the European Union
EMC and Health and Safety Directives. All equipment shipping into European Union
countries after January 1, 1996 require this type of compliance—denoted by the "CE
Mark."
Information about equipment manufactured before 1/01/96 has been moved to the respective
service manual.
Revision 3 has added the installation of the Classic Console Global User Station.
Change bars are used to indicate paragraphs, tables, or illustrations containing changes that
have been made by this update. Pages revised only to correct minor typographical errors
contain no change bars.