EasyManua.ls Logo

Honeywell TotalPlant LCN - Page 52

Honeywell TotalPlant LCN
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LCN System Installation 7-2 9/96
7.1
Make sure that each LCN module power cord is plugged in and that the margin-test
jumper is in the normal (center) position.
Turn the power switch ON on each module, one at a time, and check that the green
POWER STATUS LED is on. Remember that a Dual Node Module may have two
power switches. Correct any problems before proceeding to the next module. Refer to
the Five/Ten-Slot Service manual or Dual Node Module Service manual if service is
required.
A Deskside Global User Station has a power-on LED on the front of the electrics tower
for deskside models, and an LED on the front of the console module located at the rear
of the station.

Table of Contents

Related product manuals