Table of Contents
LCN System Installation iii 9/96
15 CONSOLE GLOBAL USER STATION
15.1 Preinstallation
15.2 Placement
15.3 Grounding
15.4 AC Power
15.5 Connection to the Ethernet
15.6 Connection to a Printer
15.7 LCN Cable Connection
16 CLASSIC CONSOLE GLOBAL USER STATION
16.1 Preinstallation
16.2 Placement
16.3 Grounding
16.4 AC Power
16.5 Connection to the Ethernet
16.6 Connection to a Printer
16.7 LCN Cable Connection
A OPTIONS INSTALLATION FOR UNIVERSAL STATIONS
A.1 Universal Station Complexing (Physical)
A.2 Module Installation
A.3 Peripheral Installation and Cabling
A.4 Trend Pen Assembly Removal and Replacement
A.5 Hiway Gateway Cabling
A.6 Enhanced Universal Work Station (EUWS) Installation
A.7 Redundant Application Module Cabling
A.8 Universal Station
X
Cabling (Universal Station Furniture)
A.9 Universal Station Cabling (Ergonomic Furniture)
A.10 Universal Station
X
Cabling (Ergonomic Furniture)
B OPTIONS INSTALLATION FOR USs IN ERGONOMIC FURNITURE
B.1 Console Complexing (Physical)
B.2 Module Installation
B.3 Peripheral Installation and Cabling
C INSTALLATIONS OF CE COMPLIANT OPTIONS
C.1 Overview
C.2 Universal Station Cabling—Classic Furniture
C.3 Universal Station Cabling—Ergonomic Furniture
C.4 Universal Station
X
Cabling—Classic Furniture
C.5 Universal Station
X
Cabling—Ergonomic Furniture
C.6 Micro TDC 3000 Cabling
C.7 Applications Module
X
(A
X
M) Cabling
INDEX