EasyManua.ls Logo

HP 8901B

HP 8901B
433 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model
8901B
Performance Tests
Section
4
PERFORMANCE
TESTS
4-1.
INTRODUCTION
The procedures in this section
test
the instrument’s electrical performance using the specifications
of
Table
1-1
as
performance
standards.
All
tests
are performed without accessing the interior
of
the instrument.
A
simpler operational
test
is
available in Section
3,
Operation,
under the title
Basic
hnctional Checks.
NOTE
Unless otherwise noted, no warm-up period
is
required for the following
tests.
Line voltage must be within
+5%
and
-10%
of
nominal if the results of the
performance tests are to be considered did.
4-2.
EQUIPMENT REQUIRED
Equipment required for the performance
tests
is
listed in Table
1-3,
Recommended Test Equipment.
Any
equipment
that
satisfies the critical specifications provided in the table may be substituted for the
recommended model(s).
4-3.
PERFORMANCE TEST RECORD
Results
of the performance
tests
may
be tabulated on the
Performance Test Record
at the end
of
the procedures. The
Performance Test Record
lists
all
of
the tested specifications and their
acceptable limits. The results, recorded at incoming inspection, can be used for comparison in periodic
maintenance and troubleshooting and after repairs or adjustments.
4-4.
CALIBRATION CYCLE
This instrument requires periodic verification of performance. Depending on the use and environmental
conditions, the instrument should be checked using the following performance
tests
at least once
every year.
4-5.
ABBREVIATED PERFORMANCE TESTING
No
abbreviation of performance testing
is
recommended.
4-1

Table of Contents

Other manuals for HP 8901B

Related product manuals