EasyManua.ls Logo

HP A-MSR900 Series - Preparing for Installation; Safety Recommendations; Site Requirements

HP A-MSR900 Series
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Preparing for installation
Safety recommendations
W
ARNING!
Before installation and operation, read all of the safety instructions in the
Compliance and Safety
Guide
supplied with your router.
General safety recommendations follow:
Turn off all power and remove all power cables before opening the chassis.
Unplug all power and external cables before moving the chassis.
Before installation, locate the emergency power switch so that you can shut off power immediately if
necessary.
Always wear an ESD-preventive wrist strap when installing the device.
Do not stare into an open optical interface. The light can cause permanent eye damage.
Use a good grounding system. This is essential for reliable operation.
Confirm that the resistance between the chassis and the ground is less than 1 ohm.
Site requirements
The router can only be used indoors.
This section provides information about temperature, humidity, cleanness, and air quality requirements, as
well as rack-mounting requirements and protection against damage from lightning and EMI.
Table 2 Temperature and humidity requirements
Tem
p
erature Relative humidit
y
0°C to 45°C (32°F to 113°F) 5% to 90%
Table 3 Dust concentration limit in the equipment room
Substance Concentration limit (
p
articles/m3)
Dust particles
3 x 10
4
(No visible dust on desk in three days)
NOTE:
Dust particle diameter 5 μm

Table of Contents

Related product manuals