EasyManuals Logo

HP ProLiant DL320 Generation 5 User Manual

HP ProLiant DL320 Generation 5
101 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
Setup 25
The leveling jacks are extended to the floor.
The full weight of the rack rests on the leveling jacks.
The stabilizing feet are attached to the rack if it is a single-rack installation.
The racks are coupled together in multiple-rack installations.
Only one component is extended at a time. A rack may become unstable if more than
one component is extended for any reason.
WARNING: To reduce the risk of personal injury or equipment damage when unloading
a rack:
At least two people are needed to safely unload the rack from the pallet. An empty
42U rack can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft)
tall, and may become unstable when being moved on its casters.
Never stand in front of the rack when it is rolling down the ramp from the pallet.
Always handle the rack from both sides.
Identifying the server shipping carton contents
Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
Server
Printed setup documentation, Documentation CD, and software products
Power cord
Rack mounting hardware kit and documentation
In addition to these supplied items, you may need:
Application software CDs or diskettes
Options to be installed
Phillips screwdriver
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
28)."
Installing the server into the rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship
with the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
website (http://www.racksolutions.com/hp
). Follow the server-specific instructions on the website to install
the rack brackets.
Use the following information when connecting peripheral cables and power cords to the server.

Table of Contents

Other manuals for HP ProLiant DL320 Generation 5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HP ProLiant DL320 Generation 5 and is the answer not in the manual?

HP ProLiant DL320 Generation 5 Specifications

General IconGeneral
Processor Sockets1
Form Factor1U Rack
Operating System SupportMicrosoft Windows Server, Red Hat Enterprise Linux, SUSE Linux Enterprise Server
ProcessorIntel Xeon 3000 sequence
MemoryUp to 8 GB
StorageUp to 2 SATA
RAID SupportIntegrated SATA RAID 0, 1
NetworkEmbedded NC105i
Expansion Slots1 x PCI-Express
Power SupplyNon-Hot Plug, Non-redundant

Related product manuals