HP ProLiant DL380 Generation 3 Server High-Density Deployment
25
Figure 3. Four low-voltage PDUs (24A)
Installation
Procedures
This section describes preparation and basic installation procedures common to various
configurations outlined in “Planning Rack Configurations.” This section discusses the following
procedures:
• Server Preparation
• Rack Preparation
• Installing PDUs in 36U, 42U, and 47U Racks
• Routing Power Cords
• Installing the Rack Rails
• Installing the Server in a Rack
• Connecting Cables
• Completing the Installation
Refer to the safety guidelines at the beginning of this document before beginning any installation
procedures.
HP recommends that you execute these steps in order, especially when multiple racks are connected
together or when a rack is populated in a separate room and relocated to its final position.