EasyManua.ls Logo

HPE ProLiant ML150 Gen9

HPE ProLiant ML150 Gen9
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations 22
The server exits standby mode and applies full power to the system. The system power LED
changes from amber to green.
7. Install and lock the tower bezel ("Install the tower bezel" on page 18).
Remove the system air baffle
1. Unlock and remove the tower bezel ("Remove the tower bezel" on page 17).
2. Power down the server (on page 17).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Place the server on its side.
5. Remove the access panel (on page 18).
6. Remove the system air baffle.
Install the system air baffle
CAUTION: For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed.

Table of Contents

Related product manuals