EasyManua.ls Logo

HPE ProLiant ML150 Gen9

HPE ProLiant ML150 Gen9
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 60
14.
Install the system air baffle (on page 22).
15. If removed, install the PCI air baffle ("PCI air baffle option" on page 57).
16. Install the access panel (on page 19).
17. Return the server to an upright position.
18. Connect each power cord to the server.
19. Connect each power cord to the power source.
20. Power up the server (on page 17).
21. Install and lock the tower bezel ("Install the tower bezel" on page 18).
Dedicated iLO port management module option
To install the component:
1. Unlock and remove the tower bezel ("Remove the tower bezel" on page 17).
2. Power down the server (on page 17).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Place the server on its side.
5. Remove the access panel (on page 18).
6. If installed, remove the PCI air baffle (on page 20).
7. Remove the system air baffle (on page 22).
IMPORTANT: The dedicated iLO port management module is installed in PCIe expansion
slot 7.
8. Open the slot latch and remove the PCIe blank.

Table of Contents

Related product manuals