Hardware options installation 74
Mini-SAS P440/P840 cable option
To install the component:
1. Unlock and remove the tower bezel ("Remove the tower bezel" on page 17).
2. Power down the server (on page 17).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Place the server on its side.
5. Remove the access panel (on page 18).
6. If installed, remove the PCI air baffle (on page 20).
7. Remove the system air baffle (on page 22).
8. Remove the fans (on page 23).
9. Disconnect and remove the existing Mini-SAS cables:
o Two 4 LFF hot-plug drive cages