EasyManua.ls Logo

HPE ProLiant ML150 Gen9 - HPE Smart Storage Battery Holder Option

HPE ProLiant ML150 Gen9
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 67
c.
Secure the power cord with the strain relief strap.
19. Connect the power cords to the AC power source.
20. Employ best practices to route and manage the power cords and other cables in the server rear
panel.
21. Power up the server (on page 17).
22. Install and lock the tower bezel ("Install the tower bezel" on page 18).
HPE Smart Storage Battery holder option
To install the component:
1. Unlock and remove the tower bezel ("Remove the tower bezel" on page 17).
2. Power down the server (on page 17).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Place the server on its side.
5. Remove the access panel (on page 18).
6. If installed, remove the PCI air baffle (on page 20).
7. Remove the system air baffle (on page 22).

Table of Contents

Related product manuals