EasyManua.ls Logo

HPE STOREONCE 5500

HPE STOREONCE 5500
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 10: Connecting power cables
4. Power on the new disk enclosure. You may need to hold down the power on button (1) on the rear of
each unit for up to 30 seconds. Look at the LEDs on the I/O modules and wait until the Green Status
LED (3) remains on, and the Locate LED (2) and the Fault LED (4) are both off.
2
1
3
4
Figure 11: Powering on the disk enclosure
5. Complete the SAS cabling as described in Cabling up to two enclosures above and two
enclosures below the head server on page 23 or Cabling all enclosures below the head server
on page 36.
Installing additional Capacity Expansion enclosures, BB933A 21

Table of Contents

Other manuals for HPE STOREONCE 5500

Related product manuals