Tools and Accessories
l ESD wrist strap
l Phillips screwdriver
l Flat-head screwdriver
l Floating nuts
l Mounting brackets
l M4 screws
l M6 screws
l RPS cable
l RPS AC power cable
Procedure
Step 1 Wear an ESD wrist strap. Ensure that the ESD wrist strap is grounded and in a close contact
with your wrist.
Step 2 Use a Phillips screwdriver to fix the front mounting brackets at both sides of the RPS150 with
M4 screws.
Step 3 Install floating nuts.
Install two floating nuts on each front mounting rail. Leave a mounting hole between the two
floating nuts on the same mounting rail.
NOTE
l The length of three adjacent mounting holes may not be 1 U. Observe the scale ticks on the
mounting rails when installing floating nuts.
l You can use a flat-head screwdriver to install floating nuts.
Huawei
AR100&AR120&AR150&AR160&AR200&AR1200&AR
1600&AR2200&AR3200&AR3600 series Enterprise
Routers
Hardware Installation and Maintenance Guide
5 Installing AR2201-48FE/AR2202-48FE Routers
Issue 05 (2018-07-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
39